At power unit no. 3 of Rivne NPP the second stage of modernization of the computer information system has been completed.
At power unit no.4 of Rivne NPP the following has been put into industrial operation:
- the MCP (main circulation pump) vibromonitoring and diagnostic system;
- the free and loose items detection system;
- the reactor facility vibrodiagnostic system;
- the complex diagnostic system with a computation network for diagnostics and monitoring;
- the coolant leaks monitoring system;
- the in-core noise diagnostic system.
Details