ENG
27.05.2025

THE UNIT 1 OF THE KHMELNYTSKYI NPP WILL OBTAIN THE UPGRADED IN-CORE MONITORING SYSTEMS

27.05.2025

SUCCESSFULLY COMPLETED SUPPLY OF 15 SETS OF ON-BOARD LOCOMOTIVE SAFETY SYSTEMS ІMPROTRAIN-250 FOR LTG INFRA (LITHUANIA)

17.01.2025

ROLLING STOCK TECHNICAL CONDITION MONITORING SYSTEMS AKRO ARE IMPLEMENTED ON THE OBJECTS OF JSC “UKRAINIAN RAILWAYS”

16.01.2025

SUPPLY AND IMPLEMENTATION OF TRACK CIRCUITS MRC-U ON THE SECTION TAPA-TARTU OF ESTONIAN RAILWAYS

16.01.2025

SUPPLY OF LOCOMOTIVE SAFETY SYSTEMS ІMPROTRAIN-250 FOR LTG INFRA (LITHUANIA)

16.01.2025

PREPARATION TO SUPPLY LOCOMOTIVE SAFETY SYSTEMS ІMPROTRAIN-250 FOR LTG CARGO AND LTG LINK (LITHUANIA)

15.01.2025

TRACK CIRCUITS MRC-U ARE SUPPLIED TO DOBELE STATION OF LATVIAN RAILWAYS

06.01.2025

PARTICIPATION OF REPRESENTATIVES OF SRPA “IMPULSE” IN THE CONFERENCE “SUPPLIER’S DAY: IRON PARTNERSHIP” HELD BY JSC “UKRAINIAN RAILWAYS”

26.12.2024

TWO MORE NPP UNITS ARE TO BE ENHANCED IMPLEMENTING THE UPGRADED IN-CORE MONITORING SYSTEMS

02.12.2024

EQUIPMENT FOR UPPER LEVEL OF COMPLEX DIAGNOSTICS SYSTEM AND FATIGUE MONITORING SYSTEM IS READY TO BE SUPPLIED TO KHMELNYTSKYI NPP

27.11.2024

LOWER LEVEL EQUIPMENT SVRK-M2 READY TO BE SUPPLIED TO RIVNE NPP UNIT 4

19.11.2024

PILOT SAMPLE OF STATIC CONVERTER HAS BEEN SUCCESSFULLY TESTED

14.11.2024

ACCEPTANCE TESTS OF AUTOMATIC TURBINE REGULATING AND PROTECTION SYSTEM EQUIPMENT FOR RNPP UNIT 4 ARE CONDUCTED

14.10.2024

CONGRATULATIONS ON SPORTS ACHIEVEMENTS!

03.10.2024

SRPA “IMPULSE” PARTICIPATED IN THE INTERNATIONAL EXHIBITION INNOTRANS-2024

01.10.2024

PARTICIPATION OF SRPA “IMPULSE” IN THE INTERNATIONAL CONFERENCE “PROSPECTS FOR THE INTRODUCTION OF INNOVATIONS IN NUCLEAR ENERGY”