HANDOVER-ACCEPTANCE TESTING OF THE SET OF REGISTRATION UNITS AKNP-IF FOR UNIT № 3 OF RIVNE NPP WAS CARRIED OUT

In June 2022, the handover-acceptance testing of the set of registration units neutron flux monitoring system AKNP-IF was carried out at the engineering site of SRPA “Impulse” in Kiev, for use as a part of AKNP-I of unit № 3 of RNPP. The commission included specialists from the customer – Rivne NPP and the supplier - SRPA "Impulse".

Based on the results of the testing, the following was confirmed: the registration units meets the requirements of technical conditions, the design documentation, the normative documentation and is ready to be supplied to unit № 3 of Rivne NPP.

After testing, the equipment was delivered to the Rivne NPP. It’s commercial commissioning has been planned for early August.


SRPA “Impulse” is a leading Ukrainian designer, manufacturer, and supplier of highly-reliable instrumentation and control systems for nuclear power engineering and railways.
 
We are on social media: