HANDOVER-ACCEPTANCE TESTING OF TECHNICAL FACILITIES FOR MODIFICATION OF AKNP-IF RNPP-4 HAVE BEEN CARRIED OUT

In March 2023, at the SRPA “Impulse” site, acceptance tests of technical facilities were carried out for the replacement of devices for registration and display information that had exhausted their service life in the neutron flux monitoring systems AKNP-I of power unit No. 4 of RNPP.

The commission included specialists from the customer - RNPP and the supplier - SRPA “Impulse”. The Commission was presented with three sets of technical facilities (two for AKNP-I AZ-SKP, one for AKNP-I Backup Control Room), three sets of spare parts and a set of documentation.

The commission stated that the tests were carried out in full in accordance with the program and methodology agreed in the established manner. They confirmed the compliance of technical facilities with the requirements of technical conditions, regulatory documents, sets of design and operational documentation.

The technical facilities are recommended for delivery to RNPP to modify the devices for registration and display information of the AKNP-I of power unit No. 4.


SRPA “Impulse” is a leading Ukrainian designer, manufacturer, and supplier of highly-reliable instrumentation and control systems for nuclear power engineering and railways.
 
We are on social media: