As part of the project “Modernization of UZ priority railway lines. Installation of train traffic control system on priority railway lines of the Trans-European Transport Network (TEN-T) corridors in Ukraine”, financed by the EBRD loan, dispatch centralization (DC) was put into operation on the sections:
- Poltava-Kremenchuk-Burti of the Southern Railway;
- Hrebinka-Myrhorod of the Southern Railway;
- Podilsk-Pomichna on the Odesa Railways;
- Lviv-Krasne-Zdolbuniv on the Lviv Railway.
DC were implemented on the basis of microprocessor dispatch centralization MDС-U manufactured by SRPA "Impulse".
Implementation of DC provided:
- Control from one point of the transportation control center (TCC) of train traffic at stations, crossings and long distance sections.
- Automation of traffic schedule maintenance and control process based on the forecast traffic schedule.
- Provision of information to TCC personnel on the situation in the dispatching section and the status of signaling and DC devices.