In November 2024, the acceptance tests of the lower level of the modified in-core monitoring system (NU SVRK-M2) for Rivne NPP Unit 4 have been passed successfully.
LL SVRK-M2 combined with the upper level ensures the following:
Diversified calculation of neutron-physical parameters of a core is performed using two software suites: "Beacon-TSM" (Westinghouse) and "ImCore" (SRPA “Impulse”).
LL SVRK-M2 is implemented based on MSKU-4 failsafe industrial controllers.
As a result of work the acceptance commission consisting of the representatives of Rivne NPP, SNRIU and SRPA “Impulse” concluded: LL SVRK-M2 with the set of documentation fully meets the requirements of TOR, regulations, rules and standards on nuclear and radiation safety including the requirements for cybersecurity, and is ready to be supplied to Rivne NPP.