Workstations PS 5120 for upper block level system (UBLS) for power unit 1 were shipped at Khmelnitsky NPP.
The equipment of hardware unified complex HUC was shipped at Khmelnitsky NPP for replacing equipment of normal operation system for reactor and turbine halls power unit 2.
Equipment of neutron flux monitoring system NFMS-I was shipped at Rovno NPP for power unit 3 back-up shutdown center BSC.