AT RIVNE NPP THE FOLLOWING HAS BEEN PUT INTO INDUSTRIAL OPERATION

At power unit no. 3 of Rivne NPP the second stage of modernization of the computer information system has been completed.

At power unit no.4 of Rivne NPP the following has been put into industrial operation:

  • the MCP (main circulation pump) vibromonitoring and diagnostic system;
  • the free and loose items detection system;
  • the reactor facility vibrodiagnostic system;
  • the complex diagnostic system with a computation network for diagnostics and monitoring;
  • the coolant leaks monitoring system;
  • the in-core noise diagnostic system.

 


SRPA “Impulse” is a leading Ukrainian designer, manufacturer, and supplier of highly-reliable instrumentation and control systems for nuclear power engineering and railways.
 
We are on social media: