In September 2014, the acceptance testing of the software and hardware system of the PTK SRT turbine regulating system for Unit 1 of Zaporizhzhya NPP was carried out at the testing ground of PJSC “SRPA “Impulse”.
The representatives of the State Nuclear Regulatory Inspectorate of Ukraine, SS “Zaporizhzhya NPP” and PJSC “SRPA “Impulse” took part in the testing.
PTK SRT, submitted for the acceptance testing, is designated to implement the functions of automatic regulation, remote control of regulating valves of the turbine regulating electro-hydraulic system.
The results of the acceptance testing confirmed that PTK SRT meets the requirements of the requirements specification, the requirements of the normative nuclear and radiation safety documents and confirmed readiness to be supplied to Zaporizhzhya NPP-1.