At the end of December 2014, the instrumentation and control system of the normal operation system for the turbine division (NOCS for TO) was commissioned (trial commissioning) at Unit 1 of Zaporizhzhya NPP.
The following was performed: autonomous debugging, complex debugging and testing, autonomous and complex debugging the software of the functions of input and information from NOCS for TO to the upper level of the control computer system, operability and operational reliability of NOCS for TO was confirmed, the operational personnel was trained.