PJSC “SRPA “Impulse” has successfully passed the management system audit and has implemented the environmental management system, the labor health and safety management system, as well as the information security management system in accordance with the requirements of the standards DSTU ISO 14001:...
In December 2017, the PKSEP design-arranged power supply system was commissioned at the Kryvyi Rig-Main Station of the Prydniprovska Railway.
...In December 2017, the MPC-U computer based point and signal interlocking systems were commissioned at the Nyzhnodniprovsk-Vuzol Station and the Post 194 km Block Post of the Prydniprovska Railw...
In December 2017, the acceptance testing of the “Black Box” systems to preserve information in the beyond-design accident conditions for units 3, 4 Zaporizhzhya NPP was carried out at the site of PJSC “SRPA “Impulse”, the systems were created within the framework of implementation of th...
In December 2017, the acceptance testing of the accident and post-accident monitoring system (PAMS) for unit 1 of Rivne NPP was carried out at the site of PJSC “SRPA “Impulse”.
...