Hardware of in-core monitoring system ICMS-M was shipped at Zaporozhye NPP power unit 3.
Units of HUC-VL were shipped at Zaporozhye NPP power unit 3.
...Equipment of HUC-VL of normal operation system of reactor and turbine halls was implemented in Khmelnitsky NPP power unit 2.
...Certification tastes of NFMS-IP emergency and preliminary protection systems of reload monitoring system EPS-RMS were successfully carried out for Rovno NPP power unit 1.
...Workstations PS 5120 for upper block level system (UBLS) for power unit 1 were shipped at Khmelnitsky NPP.
The equipment of hardware unified complex HUC was shipped at Khmelnitsky NPP for replacing equipment of normal operation system for reactor and turbine halls power unit 2.
Equipment of neutron f...
SHC control element regulation system CERS-I was implemented in Rovno NPP power unit 2 with reactor WWER 440.
...