The solemn meeting of enterprise’s personnel devoted to the professional holiday “Mechanical Engineer’s Day” took place on 21 September. A large group of employees were awarded honorary diplomas, all employees received cash bonuses. Pupils of a supported school congratulated the personnel.&nb...
From 17 to 22 September 2012 acceptance testing of NFMS-IF neutron flux monitoring system (one complete set for BCR) was carried out at unit 1 of Zaporizhzhya NPP before industrial commissioning.
...The SW and HW of the safety control system (SW & HW of SCS) of the second channel of the safety system of Unit 1 (Zaporizhzhya NPP) has been put into commercial operation.
...At unit 1 of Zaporizhzhya NPP from 27 August to 10 September the acceptance testing for industrial commissioning of the ICMS-M modernized in-core monitoring system.
...The SW and HW of the reactor division normal operation system (SW & HW of NOS (reactor)) of Unit 1 (Zaporizhzhya NPP) has been put into trial operation.
...