From 17 to 22 September 2012 acceptance testing of NFMS-IF neutron flux monitoring system (one complete set for BCR) was carried out at unit 1 of Zaporizhzhya NPP before industrial commissioning.
...The SW and HW of the safety control system (SW & HW of SCS) of the second channel of the safety system of Unit 1 (Zaporizhzhya NPP) has been put into commercial operation.
...At unit 1 of Zaporizhzhya NPP from 27 August to 10 September the acceptance testing for industrial commissioning of the ICMS-M modernized in-core monitoring system.
...The SW and HW of the reactor division normal operation system (SW & HW of NOS (reactor)) of Unit 1 (Zaporizhzhya NPP) has been put into trial operation.
...From 31 July to 2 August 2012 the acceptance testing of the SW & HW system of the normal operation system (turbine division) for unit 1 of Zaporizhzhya NPP was carried out at RPA “Impulse”.
...