In June 2015, the instrumentation and control system for post-accident monitoring of the reactor facility with the subsystem monitoring the coolant level in the reactor was put into trial operation at Unit 2 of Zaporizhzhya NPP.
...In May 2015, the MPC-U computer based interlocking developed and manufactured at PJSC “SRPA “Impulse” was put into constant operation at the Dubovo Railway Station located in Kharkiv region. Obsolete electric interlocking equipment was completely replaced by the computer based interlocking.
...In May 2015, the instrumentation and control system of the normal operation system for the turbine division (I&C of NOCS for TO) to the extent of the control and measurement instrumentation (KIP) subsystem was put into commercial operation at ZNPP-2.
...On 9 May the staff of SRPA “Impulse” participated in the holiday meeting dedicated to the 70th anniversary of the Great Victory and the parade with laying flowers to the Glory Memorial.