In August 2014, the MAB-U microprocessor automatic blocking manufactured by RPA “Impulse” was put into constant operation at the Stanishevka-Zhytomyr Span of the Southwestern Railway.
...In August 2014, the acceptance testing of the software and hardware system of the PTK ASR TO automatic regulating system of turbine division for Zaporizhzhya NPP was carried out at the testing ground of PJSC “SRPA “Impulse”.
...In July 2014, the acceptance testing of the «Black box» system to register important operational parameters (SRVP) for Unit 1 of Zaporizhzhya NPP was carried out at the testing ground of PJSC “SRPA “Impulse”.
...In June 2014, the acceptance testing of ZVT-1 humidity and temperature conversion probe manufactured by PJSC “SRPA “Impulse” took place at the site of NSC “Institute of Metrology”.
...Students of the computer engineering division of Severodonetsk Technical School visited RPA “Impulse” on 19 June 2014. They visited the installation and adjustment area, the debugging area, the testing laboratory. Also, they saw the enterprise’s museum and talked with the Assistant Director Andrii ...