The equipment of the NFMS-IF neutron flux monitoring system for the full-scale simulator of the training centre has been supplied to unit 2 of Rivne NPP.
...At Larino station of Donetsk Railway, trial operation has been completed and input-distributing-converting cabinets (ShVRP-ETs) have been put into commercial operation.
...The UKTS-VL equipment (including a set of the monitoring and diagnostics system, basic and current distribution cabinets) has been supplied to unit 1 of Khmelnitsky NPP.
...At power unit No. 1 of Zaporozhye NPP the software-hardware complex of control rod control system RCS-I was put into experimental operation.
...The following systems were put into experimental operation at power unit No. 2 of Khmelnitskiy NPP:
...