The full-scale simulator equipment for the training centre has been supplied to Zaporizhzhya NPP.
...The SSA-4/3, SSA-4/4 smooth start-up automates have been supplied to Kozloduy NPP (Bulgaria).
...The equipment of the NFMS-IF neutron flux monitoring system for the full-scale simulator of the training centre has been supplied to unit 2 of Rivne NPP.
...At Larino station of Donetsk Railway, trial operation has been completed and input-distributing-converting cabinets (ShVRP-ETs) have been put into commercial operation.
...The UKTS-VL equipment (including a set of the monitoring and diagnostics system, basic and current distribution cabinets) has been supplied to unit 1 of Khmelnitsky NPP.
...