In February 2019, the acceptance testing of the “Black Box” system to preserve information in the beyond-design accident conditions for unit 5 Zaporizhzhya NPP was carried out at the site of PJSC “SRPA “Impulse”, the system ...
In February 2019, the acceptance testing of the instrumentation and control system of the first channel of the safety control system (ESFAS-1 I&C systems) for Unit 5 of Zaporizhzhya NPP was carried out at the site of PJSC “SRPA “Impulse...
In January 2019, the acceptance testing of the process information system with integration of ARMS, ARSMS, and SPDS for unit № 5 of Zaporizhzhya NPP was carried out at the site of PJSC &ld...
During the repair campaign at unit 3 of Zaporizhzhya NPP, the control and indication equipment of the monitoring systems is being replaced by the software and hardware system by Severodonetsk works “Impulse”. The following will be upgraded during the replacement: the eq...
On 6 December 2018, teachers and students of Volodymyr Dahl East Ukrainian National University visited SRPA “Impulse”. They visited the locksmith and mechanical area, the area of electrochemical and paint-and-lacquer coatings, the installation and adjustment area, as well as ...