On 3-5 March the acceptance testing of the standby diesel generator station automatic control system (SDGS ACS) for Unit 5 of Zaporizhzhya NPP was carried out according to the acceptance testing programme approved by First Vice-President – Technical Director of SE “NNEGC “Energoa...
In December 2019, the interdepartmental acceptance testing of a new DPKr-3 three-car diesel train were successfully completed at the site of PJSC...
The Best Practice School organized by JSC “Ukrzaliznytsia” took place on the basis of Nyzhnodniprovsk-Vuzol signalling and communication division of the “Prydniprovska Railway” regional branch. The main theme of the event was discussion and acquaintance with micro...
In November 2019, the handover-acceptance testing of the power supply system for the instrumentation and control system of the control rod control system (SEP SGIU) of unit 1 of Khmelnitsky NPP was carried out at the site of PJSC “SRPA “Impulse”
...