During PPM-2022 at the Unit № 3 of the Rivne NPP, the next step was taken to replace fuel produced by TVEL (RF) with fuel produced by Westinghouse. This step is a continuation of a multi-year program that is gradually being implemented by NNEGC «Energoatom» at Ukrainian NPPs. The core topic of this pro...
In June 2022, the handover-acceptance testing of the set of registration units neutron flux monitoring system AKNP-IF was carried out at the engineering site of SRPA “Impulse” in Kiev, for use as a part of AKNP-I of unit № 3 of RNPP. The commission included specialists...
In June 2022, through the joint efforts of the specialists of JSC «Ukrainian Railways» and «Impulse» specialists, the following have been recommissioned MPC-U microprocessor interlocking system at the Vasylkov-2 station and MA...
In April 2022, a commercial commissioning of the boron concentration monitoring system was carried out at unit № 3 of South-Ukraine NPP.
...